Recent Energy Projects
See how EnergiWise delivers measurable energy savings, optimized system performance, and rebate-driven results across commercial and residential properties.
Each project is designed to reduce costs, improve efficiency, and maximize available incentives.
Serving the Northeast. Quilt Select Partner in Millbury, Sutton, Westborough, and Shrewsbury Massachusetts.
Featured Project Case Studies
Commercial Office Lighting Retrofit — Worcester, MA
Facility Type: Commercial Office Building
Scope: Full LED lighting retrofit across office floors and common areas
What We Delivered:
System redesign for improved lighting distribution
Removal of outdated fluorescent fixtures
Installation of high-efficiency LED systems
Results:
~55% reduction in lighting energy costs
Significant Mass Save incentive applied
Payback period under 2 years
EV Charging Installation — Westborough, MA
Facility Type: Commercial Office Park
Scope: Multi-unit EV charging station installation
What We Delivered:
Site assessment and infrastructure planning
Installation of scalable EV charging stations
Ongoing system support
Results:
Increased tenant satisfaction and retention
Future-ready infrastructure for EV adoption
Incentive-supported installation reducing upfront costs
Warehouse Heat Pump Upgrade — Shrewsbury, MA
Facility Type: Warehouse & Distribution Facility
Scope: HVAC system replacement with high-efficiency heat pumps
What We Delivered:
Custom heat pump system design
Integration with existing infrastructure
Full installation and commissioning
Results:
Reduced heating and cooling costs
Improved temperature consistency across zones
Rebates covering a substantial portion of project cost
Multifamily Lighting & HVAC Upgrade — Millbury, MA
Facility Type: Multifamily Residential Property
Scope: Combined lighting retrofit and heat pump upgrade
What We Delivered:
LED lighting retrofit in common areas
Heat pump system installation for improved efficiency
Integrated project management
Results:
Lower overall energy consumption
Improved resident comfort
Strong ROI through combined incentives
Typical Project Outcomes
Every EnergiWise project is designed around clear, measurable results:
30–70% Energy Savings Immediate and long-term reductions in operating costs
Incentive Optimization Projects structured to maximize Mass Save and utility rebates
Fast Payback Most upgrades achieve ROI within 1–3 years
Improved System Performance Better reliability, comfort, and operational efficiency
Serving the Northeast. Quilt Select Partner in Millbury, Sutton, Westborough, and Shrewsbury Massachusetts.
From Design to Results — What Sets These Projects Apart
Every project follows the same performance-driven approach:
Strategic system design based on real usage
Direct equipment sourcing for cost control
Full-service delivery from assessment to installation
Incentive-driven planning to reduce upfront investment
We don’t just complete projects—we deliver verifiable savings and long-term value.
Start Your Energy Upgrade
See what your building could save with a properly designed energy upgrade.
Serving the Northeast. Quilt Select Partner in Millbury, Sutton, Westborough, and Shrewsbury Massachusetts.